Operating and Maintenance Manual


Back to Index

Off Loading and Handling



Each assembly is only to be lifted at the four (4) points when provided on the channel base. For smaller units nylon straps of the correct capacity should be used. Spreaders must be used to prevent any damage when lifting using slings or lifting points.

Erection of Unit



Before mounting unit in position it is advisable that consideration is given to the access requirements of the unit, particularly with reference to the following:

That provision is made in the plant room or wherever the unit is to be installed for access to remove the following components:

Fans
Electric Heater Batteries
Filters (bags or panels)
Coils and Pipework

Access space is also essential for service and maintenance purposes, and for the removal of the motor(s).


Latest Case Studies


- Chorlton High School
- Carphone Warehouse
- Gaia Energy Centre
- more...

Operating & Maintainance Manual


- Html Format
- PDF Format

 

Latest Product


More Info...

About us


Introductory video

Air Handlers Northern
Bute Street
Weaste
Salford
M50 1DU

t | 0161 745 8888
f | 0161 745 9900