Electric Air Heater Batteries



These should be wired up in accordance with I.E.E. Regulations and local by laws. It is essential that the heater contactor is interlocked with the fan starter to prevent the heater being energised when the fans are not running. Additionally it is recommended that a fan run on facility is included within the controls to dissipate heat form the battery at the end of operation. All heater batteries incorporate a safety cut-out which must be wired into the controls system. Ensure the size of cable and contactors are suitable for load being carried. It is not recommended for P.V.C. cable to be run into the terminal box. The cable should be insulated with high temperature sleeving.

Latest Case Studies


- Chorlton High School
- Carphone Warehouse
- Gaia Energy Centre
- more...

Operating & Maintainance Manual


- Html Format
- PDF Format

 

Latest Product


More Info...

About us


Introductory video

Air Handlers Northern
Bute Street
Weaste
Salford
M50 1DU

t | 0161 745 8888
f | 0161 745 9900